CASE STUDY

Reduce energy, save money: CPG case study

A large paper products manufacturer—with distribution to more than 175 countries—came to Braincube with the hopes of reducing its steam consumption. Energy consumption consisted of 15-20% of the total paper production cost. Optimizing their entire process would reduce overall cost, increase their efficiency, and reduce their water use.

With more than 200 process parameters used to make this paper product, it’s a complex process to understand and to optimize. In addition, former analyses showed no correlations between steam consumption and process parameters.

Braincube worked with this company to create a Digital Twin of their entire production process using two years of historically-collected data. In addition to calculating the lag time, Braincube aggregated and contextualized the company’s data.  This provided the company’s engineers with a perfect data set to use for analysis. 

Use the form to download the full case study to see how this CPG company improved compliance and reduced energy across their processes.

Download the case study

To download this case study, please complete the form.

For more information on Industry 4.0 for CPG companies, read our other case studies.

The Power of Braincube

Industrials Trust Braincube

Meet some of the hundreds of companies currently using Braincube to digitally transform their manufacturing processes.

Why Braincube?

Not all IIoT Platforms are created equal. Braincube was designed by manufacturers to meet the specific challenges of today’s competitive manufacturing world.

Industry 4.0 in your Inbox

Get the latest updates on digital transformation and manufacturing best practices delivered to your inbox.

Did you know?

AI can compute 200 quadrillion calculations per second, making your business capable of amazing efficiency and growth.

Speak with a Digital Transformation Expert!

Questions? Call 1-978-689-5143 or Contact Us

Related resources: